Why use METHOD=RSPL for PROC GLIMMIX

The reason for using R (Restricted method) is because the alternative M (Maximum method) can have bias about covariance (level-2 variance in our application) and when the number of group unit is relatively small, so this is a real threat.

 

Leave a Reply